Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme
Details
| Contract Title: | Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme |
| Published Date: | Sep 26, 2025 |
| Notice Type: | Award (CompetitiveContractAwardNotice) |
| Value Banding: | Low Value |
| Delivery Point: | United Kingdom |
Description:
The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a longitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment. The structure was commissioned in 1996 and h...