Offshore Wind Accelerator: Integrated Load Analysis and Ringing Response for XXL Monopiles Foundations (ILARR) Project - Very Short Deadline
Details
| Contract Title: | Offshore Wind Accelerator: Integrated Load Analysis and Ringing Response for XXL Monopiles Foundations (ILARR) Project - Very Short Deadline |
| Published Date: | Oct 8, 2025 |
| Notice Type: | Notice (ContractNotice) |
| Value Banding: | High Value |
| Delivery Point: | United Kingdom |
Description:
Call for entries from companies and consortia interested in undertaking a study for the OWA Foundations Technical Working Group (TWG-F) to quantify confidence in the Integrated Load Analysis (ILA) results for different case study parameters to develop guidance on the minimum requirements needed to achieve suitable structural reliability. In addition, it aim to validate and develop guidelines for a modelling framework for the ringing response for XXL monopiles, which can be implemented within exi...
