Design Code Scope for Cottingwood Phases 2b, 3 and 4.

Access full document

Details

Contract Title:Design Code Scope for Cottingwood Phases 2b, 3 and 4.
Published Date:Nov 11, 2025
Notice Type:Award (ContractAwardNotice)
Value Banding:High Value
Delivery Point:United Kingdom

Description:

HE requires a Design Code to be prepared specifically for Phase 2b, 3 and 4 (parcels 2b, 3a, 3b, 4a and 4b). . The Design Code will be required to: •Comply with the requirements of Condition 15 (set out in appendix 1) as it will be submitted to the LPD for approval to discharge this condition. •Support the evaluation criteria for design. •Align with the National Model Design Code Guidance •Comply with and expand upon the parameters set out in the site wide Design Code. •Provide a detailed stipul...


Back to search results