Replacement of the hydraulic system including replacement of existing control panel Project Start
Details
| Contract Title: | Replacement of the hydraulic system including replacement of existing control panel Project Start |
| Published Date: | Nov 27, 2025 |
| Notice Type: | Award (ContractAwardNotice) |
| Value Banding: | High Value |
| Delivery Point: | United Kingdom |
Description:
Meridian Leisure Centre, Louth - During the course of recent inspection maintenance visits, the existing hydraulic movable pool floor to the main 25m pool has developed a major defect requiring urgent replacement of the hydraulic system including assistance using an underwater diving support team. The existing movable floor control panel system also requires replacement due to the current system being closed protocol and locked to the original installer....
