BRIEFLY THE PROJECT SCOPE IS TO CARRY OUT FLOOD CONTROL MEASURES TO PREVENT FUTURE FLOODING OF THE SEWAGE TREATMENT PLANT OF EPISKOPI STATION, WHICH IS LOCATED IN HAPPY VALLEY AREA. THESE MEASURES CONSIST OF THE FOLLOWING WORKS: o THE CONSTRUCTION OF A RETAINING WALL 140 METERS LONG. THE PROPOSED WALL WILL HAVE A HEIGHT OF 1.50 METERS FOR THE FIRST 45.00 METERS AND A HEIGHT OF 2.00 METERS FOR THE REMAINING 85.00 METERS. THE CHANNEL WIDTH MUST BE MINIMUM 7.00 METERS FOR THE FIRST 55.00 M AND ...