Replacement of Bridge Bearings and Expansion Joint - Harrow Manorway Abbey Wood Flyover Spans 1 to 5
Details
| Contract Title: | Replacement of Bridge Bearings and Expansion Joint - Harrow Manorway Abbey Wood Flyover Spans 1 to 5 |
| Published Date: | Feb 25, 2026 |
| Notice Type: | Notice (ContractNotice) |
| Value Banding: | High Value |
| Delivery Point: | United Kingdom |
Description:
The contract is for the removal and replacement of an existing carriageway/footway expansion joint and 36 no existing bridge bearings at the A2041 Harrow Manorway Abbey Wood Flyover. 20 no bearings for Span 4/5 have been designed by the Client's consultant. The Contractor is required to design the remaining 16 no bearings for Spans 1 to 4. Extensive concrete repair works are required in conjunction with the installation of the new bearings. Extensive temporary works will be required to allow the...
