ECC (‘Elective Care Centre’) Electrical Connection
Details
| Contract Title: | ECC (‘Elective Care Centre’) Electrical Connection |
| Published Date: | Mar 3, 2026 |
| Notice Type: | Award (ContractAwardNotice) |
| Value Banding: | High Value |
| Delivery Point: | United Kingdom |
Description:
Electrical Connection works that will provide a new 510KVA electricity supply to the Trust site. The key activities to be conducted include: - Install 1 substation; - Lay approximately 34m of HV cable; - Install a HV metred supply with HV metering up to 1.5mva, base in a GRP Housing; - Supply/Installation of 2 x HV straight joints via LiLo 300 XLPE. The proposed direct award is due to the works been related to the provision of electricity supply. These types of works need to be conducted by the...