Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler

Access full document

Details

Contract Title:Supply, installation, leasing, scheduled pre-planned and reactive maintenance for mains water chillers / coolers, bottled water chillers / coolers and instant hot water boiler
Published Date:Mar 12, 2026
Notice Type:Award (ContractAwardNotice)
Value Banding:High Value
Delivery Point:United Kingdom

Description:

Suppliers will be required to provide the following services in a cost-effective structure: General Requirements • The Contractor shall supply, install, and maintain all specified equipment at RBFRS locations. • Provision for leasing options, enabling RBFRS to forecast costs, maintain budget compliance, and upgrade or alter equipment in line with operational requirements. • All equipment shall operate from a standard 13-amp power supply, with electrical connections located within 1 metre, and wa...


Back to search results