Fulwood Bridge Painting
Details
| Contract Title: | Fulwood Bridge Painting |
| Published Date: | Apr 17, 2026 |
| Notice Type: | Notice (ContractNotice) |
| Value Banding: | High Value |
| Delivery Point: | United Kingdom |
Description:
Via East Midlands Limited Ltd is seeking to appoint 1 supplier to provide bridge painting works. The works shall consist of the preparation and repainting of Fulwood Bridge on the A38 in Sutton in Ashfield, Nottingham. The bridge is a twin deck structure with the section to be painted being the three span steel lattice girder bridge on the north side. Spans to the bridge consist of two side spans measuring 13.3m and a central span of 17.1m. 4x no. lattice girders present connected via cross bra...
