Commercial Gas Boiler Replacement CB1
Details
| Contract Title: | Commercial Gas Boiler Replacement CB1 |
| Published Date: | May 10, 2026 |
| Notice Type: | Notice (ContractNotice) |
| Value Banding: | High Value |
| Delivery Point: | United Kingdom |
Description:
Replace the commercial boilers (38 years old) with new boilers. Connect back onto the existing pipework system. Check the flow rates prior to commencing the works, noting that all the test points are currently blocked. Electrical wiring of boilers and associated equipment to be delivered within the scope. The control systems are more recent so retain the existing control systems and pipework with only the minimum modifications to integrate the new boilers into the existing system. If modificati...
