The Replacement of the Oil-Fired Heating System with an Air Source Heat Pump System at Shield Road Primary School
Details
| Contract Title: | The Replacement of the Oil-Fired Heating System with an Air Source Heat Pump System at Shield Road Primary School |
| Published Date: | May 20, 2026 |
| Notice Type: | Notice (CompetitiveContractNotice) |
| Value Banding: | Low Value |
| Delivery Point: | United Kingdom |
Description:
The Replacement of the Oil-Fired Heating System with an Air Source Heat Pump System at the Specified School....
