RFT to Modify + Install Upgraded Air Extraction Duct Work on our Coating Line T+G Area at SmartPly Europe DAC ‘26

Access full document

Details

Contract Title:RFT to Modify + Install Upgraded Air Extraction Duct Work on our Coating Line T+G Area at SmartPly Europe DAC ‘26
Published Date:May 20, 2026
Notice Type:Notice (ContractNotice)
Value Banding:High Value
Delivery Point:Ireland

Description:

SMARTPLY Europe DAC is seeking suitably qualified engineering companies to modify and install an upgraded Air Extraction Duct system in the Coating Line and T+G (Tongue + Groove) area of the plant at our site in Belview Port, Slieverue, via Waterford (X91 PX75). This system is required to improve airflow in the ducts and provide separate Bag House connections for each production line. All ducting and final detailed drawings will be supplied by Scheuch GmbH (Free Issue to the Contractor). The Con...


Back to search results