Rapid Electric Vehicle Charge Points Delivery (TfL Rapids Re-Let Project)

Access full document

Details

Contract Title:Rapid Electric Vehicle Charge Points Delivery (TfL Rapids Re-Let Project)
Published Date:Jun 3, 2026
Notice Type:Notice (PriorInformationNotice)
Value Banding:High Value
Delivery Point:United Kingdom

Description:

In 2017, Transport for London (TfL) awarded a framework agreement for the delivery of Rapid Electric Vehicle Charge Points (EVCPs). Between 2018 and 2021, approximately 300 50kW rapid chargers were installed across TfL, borough, and private land sites. Of these, 142 EVCPs were delivered on TfL highways and land, comprising a mix of taxi-dedicated and publicly accessible EVCPs. TfL was responsible for the enabling works (such as site design, power connections, and civil engineering) to prepare lo...


Back to search results