GALW/COSE1842/2026 CFT for the Supply, Delivery, Installation, Calibration and Maintenance of a complete system for off-gas measurement equipment for use in wastewater treatment facilitie
Details
| Contract Title: | GALW/COSE1842/2026 CFT for the Supply, Delivery, Installation, Calibration and Maintenance of a complete system for off-gas measurement equipment for use in wastewater treatment facilitie |
| Published Date: | Jun 10, 2026 |
| Notice Type: | Notice (ContractNotice) |
| Value Banding: | High Value |
| Delivery Point: | Ireland |
Description:
It is intended that the framework will be used for all of University of Galway’s requirements for off-gas monitoring equipment at wastewater treatment case study sites arising during the life of the Framework....
