E1330 Pocklington HRC Drainage Upgrade
Details
Contract Title: | E1330 Pocklington HRC Drainage Upgrade |
Published Date: | Apr 4, 2025 |
Notice Type: | Award (CompetitiveContractAwardNotice) |
Value Banding: | Low Value |
Delivery Point: | United Kingdom |
Description:
To Install a full new drainage system to the existing Pocklington Household Waste Recycling Site. The new system is to include storage, flow control, a penstock, and a new outfall into an existing ditch along with a new foul drainage system. The works will also include kerbing around the entire perimeter of the site and raising of the existing surfacing in a small area....