The design, installation, test and commission the new heating system, which is to include the removal and replacement of 2 No. gas fired boilers and controls together with the design, supply, installation, test and commission of a new hot water supply and return systems including gas fired water heaters, and booster pumps.

Access full document

Details

Contract Title:The design, installation, test and commission the new heating system, which is to include the removal and replacement of 2 No. gas fired boilers and controls together with the design, supply, installation, test and commission of a new hot water supply and return systems including gas fired water heaters, and booster pumps.
Published Date:Sep 16, 2025
Notice Type:Notice (CompetitiveContractNotice)
Value Banding:Low Value
Delivery Point:United Kingdom

Description:

Sport Pavilion - replacement heating and hot water system: • Sampling and analysis of water quality for heating water systems. • Sampling and analysis of water quality for hot and cold-water systems. • Validation of heating water flow rates within the plantroom. • Removal of the existing heating boilers, flues and associated pipework etc. • Survey the existing heating, hot and cold-water services throughout the building. • To specify, supply and install, test and ...


Back to search results