The design, installation, test and commission the new heating system, which is to include the removal and replacement of 2 No. gas fired boilers and controls together with the design, supply, installation, test and commission of a new hot water supply and return systems including gas fired water heaters, and booster pumps.
Details
| Contract Title: | The design, installation, test and commission the new heating system, which is to include the removal and replacement of 2 No. gas fired boilers and controls together with the design, supply, installation, test and commission of a new hot water supply and return systems including gas fired water heaters, and booster pumps. |
| Published Date: | Sep 16, 2025 |
| Notice Type: | Notice (CompetitiveContractNotice) |
| Value Banding: | Low Value |
| Delivery Point: | United Kingdom |
Description:
Sport Pavilion - replacement heating and hot water system: • Sampling and analysis of water quality for heating water systems. • Sampling and analysis of water quality for hot and cold-water systems. • Validation of heating water flow rates within the plantroom. • Removal of the existing heating boilers, flues and associated pipework etc. • Survey the existing heating, hot and cold-water services throughout the building. • To specify, supply and install, test and ...
